Home > News > Film Blowing Machine News

Blowing machine routine maintenance work content
Blowing machine routine maintenance work content:
1. Check the temperature-controlled intact, heater parts intact, whether the temperature at various points within the range of indicators
2. Check each run motor current, speed, temperature, precision, noise and mechanical transmission case meets the criteria, check the gearbox oil level and mechanical lubrication.
3. battlefield traction speed, film width, thickness control is accurate.
4. Observe both the uniform film thickness. Fold Path meets the criteria.
5. Observe the film plastics, and found that grain, stiff block, waterlines timely manner.
6. Check the air pressure of the reservoir is operated in compliance with the requirements of the cylinder, clean the oil-water separator
7. Check the control ratio of raw materials, mixed case meets the criteria.
8. periodic calibration die, traction, the midpoint of guide rollers, levelness, balance.
 

Product Search

Contact Us

    联系新澳门葡萄京8814

    TEL: 0086 577-66886398 / 66809311
    FAX: 0086 577-66886498
    ADD: Building D20, Zhihui Industrial Park, No. 33, Tingchao Road, Shangwang Street, Ruian City, Zhejiang Province-1-2
    Mail: 23541115@qq.com

All rights reserved?Ruian City DeBang Machine Co.,Ltd.   

XML 地图 | Sitemap 地图